Laser processing (25min)
Machine & module
xTool S1
20W
Compatibles · 11
Material used
1/8"(3mm) Basswood Plywood
98
773

Instruction

1

Step1

Mini Bar instruction: step 1 -
Preview
Mini Bar instruction: step 1 -
Preview
Mini Bar instruction: step 1 -
Preview
Mini Bar instruction: step 1 -
Preview

Step 1: Upload SCX file and ensure the settings are correct for your module before processing. Processing time was 20min.

Step 2: Take the longest piece with wood engravings on it(color red) and place it down as the floor for the bar. 

Step 3: Take the three pieces colored purple and glue them together(I used superglue) in a U shape.(as seen in photo) purple section will be the front of the bar. ensure the wood engravings are facing forward. 

Step 4: repeat the same process and with the orange section. 

Step 5: Glue the purple and orange section to the floor leaving a small gap as seen in photo. the orange section is slightly smaller so it will go towards the back. 

Step 6: take the the U shaped wood and glue them to the purple and orange section creating bar top. then take the last rectangle piece and glue it to the backside of the floor creating a backwall. 

Step 7: Glue the long thin piece of wood to the back wall (creating the shelf) where you think will look good. then glue the tv in the center and glue the bottles to the back wall as well. 

Step 8: glue the bartender to the bar top. I used the bottom of the martini glass as a reference to align it correctly. 